Hotel Under Construction

Complete technology infrastructure implementation for a new hotel – from design to operation

Context:

A new hotel (5★, 150 rooms) under construction required:

  • proper infrastructure planning from the initial design phase
  • integration of all systems into a single ecosystem
  • long-term cost optimization
  • avoidance of costly post-construction modifications
  • compliance with international standards

ITGlobal Approach:

ITGlobal was involved from the technical design phase, working directly with:

  • architect
  • MEP designer
  • general contractor

Implemented Solutions:

  1. IT Infrastructure & Structured Cabling
  • complete structured cabling network
  • server racks, technical rooms, and redundancy
  • enterprise Wi-Fi network for guests and staff
  1. Hotel Access Control
  • RFID room access cards with optional mobile key
  • role-based staff access
  • PMS integration
  1. CCTV Systems
  • complete indoor and outdoor coverage
  • intelligent cameras with video analytics
  • central monitoring station
  1. Fire Detection & Alarm System
  • fully addressable fire detection system
  • integration with evacuation and access control
  • full regulatory compliance
  1. Public Address & Voice Evacuation
  • PA system throughout the property
  • automated emergency evacuation scenarios
  • background music in public areas
  1. Building Management System (BMS)
  • HVAC control
  • lighting control
  • energy consumption monitoring
  • scenario-based automation
  1. Smart Hotel Room Automation
  • lighting, temperature, and curtain control
  • automated check-in and check-out scenarios
  • energy-saving mode when rooms are unoccupied
  1. Digital Signage & Hospitality TV
  • digital displays in reception and common areas
  • customized in-room TV experience
  • promotion of hotel services

System Integration (Critical Element):

All systems were designed as a single integrated ecosystem from the construction phase:

  • access card automatically activates the guest room
  • BMS adjusts energy consumption based on occupancy
  • fire alarm triggers evacuation procedures and door unlocking
  • PMS synchronized with all integrated systems

Key Advantage (Real Differentiator):

Implementation during the construction phase results in 30–40% lower costs compared to post-opening upgrades.

Results:

  • zero major interventions after opening
  • fully operational system from day one
  • optimized operating costs
  • premium guest experience
  • scalable, future-ready infrastructure

If technology is not planned during the construction phase, implementation costs increase exponentially after the hotel opens.